before..and after utt renovation

this early C19 hearth was having a bad time…covered in cement and gypsum plaster that made it damp, filled in with concrete blocks, and with a range so full of water that it fell apart in our hands. We removed the 1980s ceilings, replaced and insulated the dry-lining and lime-pointed up the hearth wall.
It isn’t finished yet….but it is getting there!

Previous Post Next Post

Leave a Reply

Your email address will not be published. Required fields are marked *